Request for Proposal

Submit RFP

The Brief

Tower 10 Burger

Food Truck Fabrication

Located in Tampa Florida, Tower 10 Burger (TTB) is a fast casual burger concept backed by private equity group Gregg & Gregg, LLC. Our immediate need is a single food truck with a target launch date of Mid-September 2023.  We are seeking a professional food truck fabricator to create a lasting partnership that can fuel our growth potential. We have an aggressive expansion strategy planned over the next 3 to 5 years. We look forward to the opportunity to partner with you.

RFP Instructions

01

Equipment & Costs

Fill in the EquipmentNotes, or Description field with information about the relevant equipment or services that you can provide. In the Cost field, please provide the associated cost of such equipment or service.

  • Leave items blank if you would like TTB to provide.
  • Preferred brands are included, but recommendations are encouraged.

02

Timeline

Provide a detailed timeline for fabrication, inspection, permitting, etc.

    03

    Warranty

    Provide warranty information or guarantee of craftsmanship.

      04

      Payment

      Provide desired payment terms.

        Submit RFP

        All proposals must be submitted by May 7, 2023.

        Gregg & Gregg, LLC will provide written response on or before May 21st, 2023.

        If you would like to respond by email, download and fill in the PDF document. Your response must be emailed to info@greggandgregg.com by May 7.

          Contact Information

          Equipment and Costs

          Fill in the Equipment, Notes, or Description field with description of the relevant equipment or services that you can provide. In the Cost field, please provide the associated cost of such equipment or service.

          • Leave items blank if you would like TTB to provide.
          • Preferred brands are included, but recommendations are encouraged.

          16’ Stepvan

          Specifications
          Gasoline or Diesel Preferred brand: MT-45

          Equipment

          Cost (USD)

          60” x 24” Griddle

          Specifications
          Liquid propane Five (5) burners Thermostatic controlled 1” flat plate polished steel Temp range: up to at least 500°F Preferred brand: Vulcan MSA-60-101

          Equipment

          Cost (USD)

          Floor fryer

          Specifications
          Open pot Two (2) pots with two baskets per pot 40 lbs. capacity each pot Liquid propane Thermostatic controlled Preferred brand: Pitco SG14

          Equipment

          Cost (USD)

          Refrigerated prep table

          Specifications
          No less than twelve (12) 1/6 size pan capacity Preferred brand: True TSSU-48-12

          Equipment

          Cost (USD)

          Refrigerated chef base

          Specifications
          Two (2) drawers Three full hotel pans per drawer capacity Preferred brand: True TRCB-52-60

          Equipment

          Cost (USD)

          Reach-in freezer

          Specifications
          Bottom mounted compressor Preferred brand: True T-19F

          Equipment

          Cost (USD)

          Hood and fire suppression system

          Description

          Cost (USD)

          3 compartment sink with hand wash sink & plumbing

          Description

          Cost (USD)

          Two (2) stainless steel worktables to fit

          Notes

          Cost (USD)

          Air conditioner

          Equipment

          Cost (USD)

          Electrical

          Specifications
          Ability to switch between generator and shore power hook-up

          Description

          Cost (USD)

          Generator

          Specifications
          12,000W 68DB @ 7 meters

          Equipment

          Cost (USD)

          Generator slide-out

          Notes

          Cost (USD)

          Two (2) 100 lb. propane tanks

          Equipment

          Cost (USD)

          Single (1) concession window

          Description

          Cost (USD)

          Exterior customer counter

          Description

          Cost (USD)

          Full length awning

          Equipment

          Cost (USD)

          Full track wrap

          Notes

          Cost (USD)

          Fabrication

          Specifications
          16’ truck build out

          Notes

          Cost (USD)

          Florida inspection & permitting

          Notes

          Cost (USD)

          Gregg & Gregg

          Your Tampa Bay Private Equity Partner